Shoring of members that will act compositely with the concrete to be placed should be done with great care to ensure sufficient bearing, rigidity, and tightness to prevent settlement or deflections beyond allowable limits. Mary Krumboltz. Jan 12, Engineerbabu. Using standard specifications such as ACI that have many input sources in development can mitigate these possible problems. The advancing slope method— a continuous method of placement—is usually preferred for tunnels driven through competent rock, ranging between 10 and 25 ft 3 and 8 m in diameter and at least 1 mi 1.
nest...