The area outside the casing holes shall be sealed with cement grout to prevent entry of surface water. Enclosure: Site Specific d. Installation Contractor shall correct any deficiencies in the anode installations. Control units shall have a minimum of two electrode channels with a selector switch to allow operator selection of the controlling electrode. Vertical anode holes shall be completely backfilled with coke breeze to depth of the cable trench.
nest...