network ders notları / Sap Nedir Sap Ders Notları PDF | PDF

Network Ders Notları

network ders notları

Building A Router-Based Network

THEORETICAL BACKGROUND
A network is a group of two or more computer
systems linked together. A computer
network or data network allows computers to
exchange data. In computer networks, networked
computing devices exchange data with each other
along network links either cable media or
wireless media. The best known computer network
is the internet.

THEORETICAL BACKGROUND
TYPES OF NETWORK
Hub Based Network
Hubs are inexpensive devices that can be used in a
network to provide port or connection sharing. Hubs
repeat everything they receive and can be used to
extend the
network. However, this can result in a lot of
unnecessary traffic being sent to all devices on the
network.

THEORETICAL BACKGROUND
TYPES OF NETWORK
Switch Based Network
Controls the flow of network traffic based on the
address information in each packet. A switch learns
which devices are connected to its ports and then
forwards on
packets to the appropriate port only. This switching
operation reduces the amount unnecessary traffic that
would have occurred if the same information had been
sent from every port.

THEORETICAL BACKGROUND
TYPES OF NETWORK
Router Based Network
A
router
a device
forwards
data and
packets
The
most is
familiar
typethat
of routers
are home
smallalong
office
routers
thatAsimply
data such as
pagestwo
and email
networks.
routerpass
is connected
toweb
at least
between
thecommonly
home computers
and the
internet.
networks,
two LANs
or WANs
or More
a LAN and its
sophisticated
routers
suchare
as enterprise
connect
ISPs network.
Routers
located atrouters
gateways,
thelarge
ISP
networks
uptwo
to the
places
where
or powerful
more networks
core routers that forward data at high speed along the optical
connect.
fiber lines of the internet backbone.

THEORETICAL BACKGROUND
There are several advantages and disadvantages in
a router.
Advantages:
Easily shared internet
Security and adaptability
Disadvantages:
Complicated setup
Data overhead

THEORETICAL BACKGROUND
This experiment will give us a better
understanding on how router works
and building a simple network using a
router. This experiment also focuses on
the ability to connect two PCs to
create a simple router based
network.

OBJECTIVES
Create a simple network using a
router
Configure workstation IP address
information
Test connectivity using the ping
command

MATERIALS

At least 2 PCs with Ethernet NIC


installed
Router (at least 4 ports)
2 Ethernet cables (straight-through)

PROCEDURES
1. Prepare all materials. Turn on both PCs
and router. Connect both PCs to the
router using the Ethernet cables. One
slot for each PC.
2. Verify the connections by insuring that
the link lights on both NICs are lit (or
blinking).

PROCEDURES
3. Go to START > CONTROL PANEL >
NETWORK CONNECTION or go to START
and type in search box ncpa.cpl. You
will be directed to the Network
Connection window similar to what is
shown:

PROCEDURES
4. Open the Ethernet icon and under the
Ethernet Properties window, find
Internet Protocol Version 4 (TCP/IPv4)
and open it. A window will pop-out
similar to what is shown:

PROCEDURES
5. Enable Use the following IP address and
type in your desired IP address. May we
suggest, for the sake of uniformity, use IP
addresses 192.168.1.11 for PC 1 and
192.168.1.12 for PC 2 then click OK.
(Note: the operating system used for the activity
is Windows 10, should there be a problem
concerning differences between operating
systems used for the activity, please ask help
from facilitators)

PROCEDURES
6. Next, go to START and type in the search box
cmd. A command prompt window will popout. For PC 1, type in ping 192.168.1.12,
this tests connectivity from PC 1 to PC 2 and
for PC 2, type in ping 192.168.1.11, this
tests connectivity from PC 2 to PC 1.

PROCEDURES

7. To see how many layers the connection


needs to pass through in order to reach its
destination, type in the command prompt
tracert.

Нижнее меню

RU2015119649A - Способ и устройство для определения местонахождения однофазного замыкания на землю в распределительной сети на основе вейвлет-преобразования переходных сигналов - Google Patents

Способ и устройство для определения местонахождения однофазного замыкания на землю в распределительной сети на основе вейвлет-преобразования переходных сигналов Download PDF

Info

Publication number
RU2015119649A
RU2015119649ARU2015119649ARU2015119649ARU2015119649ARU 2015119649 ARU2015119649 ARU 2015119649ARU 2015119649 ARU2015119649 ARU 2015119649ARU 2015119649 ARU2015119649 ARU 2015119649ARU 2015119649 ARU2015119649 ARU 2015119649A
Authority
RU
Russia
Prior art keywords
terminals
damage
zero sequence
sequence current
power line
Prior art date
Application number
RU2015119649A
Other languages
English (en)
Other versions
RU2632989C2 (ru
Inventor
Цзинсюй МУ
Цзэнпин ВАН
Иннань ВАН
Цинци ЧЖАО
Чжэн ЦИ
Кунья ГО
Тао ЧЖЭН
Original Assignee
Стейт Грид Корпорейшн Оф Чайна
Стейт Грид Ляонин Электрик Пауэр Ко., Лтд. Шэньян Пауэр Компани
Норт Чайна Электрик Пауэр Юниверсити
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from CN201210531447.2external-priority
Application filed by Стейт Грид Корпорейшн Оф Чайна, Стейт Грид Ляонин Электрик Пауэр Ко., Лтд. Шэньян Пауэр Компани, Норт Чайна Электрик Пауэр ЮниверситиfiledCriticalСтейт Грид Корпорейшн Оф Чайна
Publication of RU2015119649ApublicationCriticalpatent/RU2015119649A/ru
Application grantedgrantedCritical
Publication of RU2632989C2publicationCriticalpatent/RU2632989C2/ru

Links

  • 230000001052transientEffects0.000claims4
  • 238000004891communicationMethods0.000claims3
  • 238000010295mobile communicationMethods0.000claims3
  • 239000000835fiberSubstances0.000claims2
  • 230000005540biological transmissionEffects0.000claims1
  • 238000006243chemical reactionMethods0.000claims1
  • 230000003111delayedEffects0.000claims1

Classifications

    • G—PHYSICS
    • G01—MEASURING; TESTING
    • G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/08—Locating faults in cables, transmission lines, or networks
    • G01R31/088—Aspects of digital computing
    • G—PHYSICS
    • G01—MEASURING; TESTING
    • G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/08—Locating faults in cables, transmission lines, or networks
    • G01R31/081—Locating faults in cables, transmission lines, or networks according to type of conductors
    • G01R31/086—Locating faults in cables, transmission lines, or networks according to type of conductors in power transmission or distribution networks, i.e. with interconnected conductors
    • G—PHYSICS
    • G01—MEASURING; TESTING
    • G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/08—Locating faults in cables, transmission lines, or networks
    • G—PHYSICS
    • G01—MEASURING; TESTING
    • G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/50—Testing of electric apparatus, lines, cables or components for short-circuits, continuity, leakage current or incorrect line connections
    • G01R31/52—Testing for short-circuits, leakage current or ground faults
    • Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00—Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
    • Y04S10/52—Outage or fault management, e.g. fault detection or location

Claims (15)

1. Способ определения местонахождения секции однофазного замыкания на землю в распределительной сети на основе вейвлет-преобразования переходного сигнала, содержащий этапы, на которых:

(1) обнаруживают в реальном времени токи нулевой последовательности, создаваемые искусственным путем в цепи вторичной обмотки трансформатора тока, в многочисленных местонахождениях линий электропередачи с помощью терминалов, установленных на них;

(2) захватывают переходные сигналы тока нулевой последовательности, которые опережают и запаздывают на 2 периода от предварительно установленного начального значения непосредственно после того, как ток нулевой последовательности, обнаруженный с помощью какого-либо терминала, превысит начальное значение;

(3) производят вейвлет-преобразование над переходными сигналами тока нулевой последовательности четырех периодов на основании алгоритма Малла, в котором переходные сигналы тока нулевой последовательности разлагаются на третий масштаб, чтобы получить максимум модуля Mj,k коэффициентов детализации в различных масштабах, где j - подстрочный индекс масштаба; k - различные точки максимума модуля на масштабе j; используя максимум модуля коэффициентов М1,1 и М2,1 детализации в первом и втором масштабах, записывают данные этих двух точек и затем выбирают точку с бóльшим модулем путем сравнения, при этом момент времени в выбранной точке представляет собой время T0 повреждения;

(4) выбирают T0 в качестве начальной точки для интегрирования и 10 мс в качестве интервала интегрирования, интегрируют компонент аппроксимации переходных сигналов тока нулевой последовательности на первом масштабе и затем передают интегрированное значение в основную станцию;

(5) сравнивают символы интегрированных значений, загруженных из отдельных терминалов, и затем производят оценку в соответствии со следующими различными ситуациями:

i) если символы интегрированного значения, загруженного из всех терминалов, являются одинаковыми, повреждение возникает в других линиях электропередачи без установленного терминала одной и той же шины;

ii) если символы интегрированных значений, загруженных из одного или более терминалов в линии, не соответствуют символам из других терминалов линий электропередачи и количество одного или более терминалов меньше, чем количество других терминалов, повреждение возникает в секциях линии электропередачи, в которых находится упомянутый один или несколько терминалов; маркируют секции линии электропередачи как секции линии электропередачи с возможным повреждением и производят последовательный поиск, начиная с терминала, расположенного ближе всего к шине, в секциях линии электропередачи с возможным повреждением до тех пор, пока не будут обнаружены два соседних терминала с различными символами интегрированных значений, затем определяют повреждение, которое возникло в секции линии электропередачи между двумя соседними терминалами;

iii) если результат поиска на этапе ii) показывает, что символы интегрированных значений, загруженных из всех терминалов на линиях электропередачи с возможным повреждением, являются согласующимися, то определяется, что повреждение возникло ниже по ходу терминала на линии электропередачи с повреждением, который располагается дальше всего от шины, то есть находится в секции линии электропередачи между наиболее отдаленным терминалом и нагрузкой.

2. Устройство для определения местонахождения секции однофазного замыкания на землю в распределительной сети с помощью способа по п. 1, в котором устройство содержит две части: основную станцию и терминалы, где:

терминалы устанавливаются на башенной опоре воздушной линии электропередачи или внутри шкафа кабельной сети с кольцевой организацией и соединены с основной станцией через волоконно-оптическую связь или мобильную связь, принимают сигналы фазного тока с вторичной стороны CT в распределительной цепи на своих входах и вырабатывают сигналы фазного тока, синтезированные

таким образом, чтобы получить сигналы тока нулевой последовательности;

основная станция устанавливается в помещении подстанции или диспетчерского центра, принимающего сигналы, которые передаются терминалами.

3. Устройство по п. 2, в котором терминалы включают в себя последовательно соединенный преобразователь тока, модуль A/D преобразования, модуль CPU, модуль волоконно-оптической связи и модуль мобильной связи; и терминалы производят вейвлет-преобразование над переходным сигналом тока нулевой последовательности и загружают результаты анализа в основную станцию.

4. Устройство по п. 2, в котором основная станция представляет собой промышленный компьютер управления и включает в себя модуль волоконно-оптической связи и модуль мобильной связи, принимающий данные, переданные посредством терминалов; и основная станция сравнивает признак повреждения тока нулевой последовательности из отдельных терминалов и определяет поврежденную секцию после вычисления и отображает ее оператору.

RU2015119649A2012-12-102013-11-08Способ и устройство для определения местонахождения однофазного замыкания на землю в распределительной сети на основе вейвлет-преобразования переходных сигналов RU2632989C2 (ru)

Applications Claiming Priority (3)

Application NumberPriority DateFiling DateTitle
CN201210531447.22012-12-10
CN201210531447.2ACN102944817B (zh) 2012-12-102012-12-10基于暂态信号小波变换的配电网单相接地故障定位方法及定位装置
PCT/CN2013/001355WO2014089899A1 (zh) 2012-12-102013-11-08基于暂态信号小波变换的配电网单相接地故障定位方法及定位装置

Publications (2)

ID=47727778

Family Applications (1)

Application NumberTitlePriority DateFiling Date
RU2015119649ARU2632989C2 (ru) 2012-12-102013-11-08Способ и устройство для определения местонахождения однофазного замыкания на землю в распределительной сети на основе вейвлет-преобразования переходных сигналов

Country Status (3)

Cited By (1)

Publication numberPriority datePublication dateAssigneeTitle
CN110927518A (zh) *2019-11-152020-03-27国网江苏省电力有限公司常州供电分公司小电流接地系统单相接地故障拉路选线方法

Families Citing this family (36)

Family Cites Families (17)

Publication numberPriority datePublication dateAssigneeTitle
US5138265A (en) *1988-11-301992-08-11Sumitomo Electric Industries, Ltd.Apparatus and system for locating thunderstruck point and faulty point of transmission line
JP2000050488A (ja) *1998-07-282000-02-18Kansai Tech Corp高圧配電線の地絡故障原因判別方法
CN1458725A (zh) *2003-06-062003-11-26天津大学配电网馈线单相接地故障依据理论准则实现保护的方法
RU2254586C1 (ru) *2003-12-242005-06-20Новосибирский государственный технический университетСпособ определения фидера с однофазным дуговым замыканием на землю в радиальных распределительных кабельных сетях
CN100386637C (zh) *2005-01-122008-05-07杭州佳和电气有限公司小接地电流电网单相接地故障选线方法及其选线系统
HU0700837A2 (en) *2007-12-212009-08-28Andras Dr DanMeasuring system for localising and identifying a resistance of earth fault in active network and method for using the system
CN101546906B (zh) *2009-05-052011-04-06昆明理工大学利用s变换能量相对熵的配电网故障选线方法
CN201656455U (zh) *2009-10-232010-11-24北京丹华昊博电力科技有限公司基于ft3传输协议的小电流接地选线装置
CN201570857U (zh) *2009-10-232010-09-01华北电力大学基于分布式测量技术的小电流接地选线装置
CN201697993U (zh) *2010-04-282011-01-05华北电力大学配电网单相接地故障带电定位装置
CN101839958B (zh) *2010-04-282012-02-08华北电力大学配电网单相接地故障带电定位装置
CN102221660B (zh) *2011-03-182013-08-21华北电力大学小电流接地故障在线定位装置
CN202720306U (zh) *2012-08-022013-02-06海南电力技术研究院基于套接式架空线路ct的配电网故障定位装置
CN102981099B (zh) *2012-12-102014-12-03辽宁省电力有限公司沈阳供电公司基于遗传算法的配电网单相接地故障定位方法及定位装置
CN102967800B (zh) *2012-12-102015-06-03辽宁省电力有限公司沈阳供电公司基于暂态信号Prony算法的配电网单相接地故障区段定位方法及定位装置
CN102944817B (zh) *2012-12-102015-01-07国家电网公司基于暂态信号小波变换的配电网单相接地故障定位方法及定位装置
CN203054159U (zh) *2013-01-072013-07-10海南电力技术研究院基于零序电流同步测量的配电网故障定位装置

Cited By (2)

Publication numberPriority datePublication dateAssigneeTitle
CN110927518A (zh) *2019-11-152020-03-27国网江苏省电力有限公司常州供电分公司小电流接地系统单相接地故障拉路选线方法
CN110927518B (zh) *2019-11-152021-10-08国网江苏省电力有限公司常州供电分公司小电流接地系统单相接地故障拉路选线方法

Also Published As

Similar Documents

nest...

batman iftar saati 2021 viranşehir kaç kilometre seferberlik ne demek namaz nasıl kılınır ve hangi dualar okunur özel jimer anlamlı bayram mesajı maxoak 50.000 mah powerbank cin tırnağı nedir