The area is very little leveled, and except the remains of the wall in the foundation zone trenches: 5, 6, 7 , no more signiicant architectonic structure was excavated. After removing of this illing, the base of the pool was shown, covered with mosaic. At the beginning of the 3rd phase, all rooms A1, B1,2 and 3, M1 and M2, are being covered with the mosaic of the same manner of drafting. Prvobitno je zid sa ove strane bio prislonjen uz padinu, odnsosno ukopan je kao i cijela sjeverna strana. We'll assume you're ok with this, but you can opt-out if you wish.
nest...